SCDOT Announces Bridge Project Traffic Delays on US 21 Over Harbor River
Friday, March 8, 2019 2:00 PM
According to a recent announcement from the South Carolina Department of Transportation (SCDOT) and in conjunction with the United Infrastructure Group (UIG), traffic delays will occur on US 21 over the Harbor River Bridge from Butches Road to Harbor Drive [map], Monday, March 11 through Friday, March 15. The lane closures will occur from 9 a.m. to 4 p.m. and are necessary for construction trucks moving in and out of the project site.
The scheduled time is approximate and dependent on the weather. Motorists traveling near the construction zones are asked to be aware of equipment and crews, new and changing traffic patterns, and to comply with traffic control signs, reductions in speed limits, and message board information.
Direct questions to Felipe Rosa with UIG at felipe.rosa@uig.net or 704-975-5452 and SCDOT Resident Construction Engineer Sarah Gaffney at GaffneySH@scdot.org or 843-514-9847.
SCDOT has initiated the Harbor River Bridge Replacement Project as a matter of public safety [details]. The Butcher’s Island Boat Landing will remain open to the public.